A wood deck looks finished the week you stain it. Two seasons later the owner is often pricing composite, and the elevated stone work has gone to a deck builder because a raised patio meant excavation, gravel, and a wall. You can put pavers on a frame instead.
This comparison is from Greg Borger of Stone Deck Innovations on the How to Hardscape Podcast: SilcaGrate (episode 34) and Paverdeck and TileDeck (episode 35). He distributes the products in Canada. Prices, weights, and warranties below are what he said in March 2020. They are not a current price list, a load chart, or contract language.
This is not a wood-deck manual, and it is not pavers or porcelain on grade. Those still need a compacted base. These systems are for a deck, balcony, raised walk, or porch on fresh fill, where digging a patio is the wrong tool.
What Goes Wrong With Wood, and With a Raised Patio
Borger’s own yard is the picture. A septic bed in rural Ottawa sat where he wanted a patio, so he built a multi-tier wood deck of about 2,000 square feet. Wood can look right. In his telling it also had to be stripped, sanded, cleaned, and stained, and about two years later it looked the same. Composite was the usual next step. He did not want it. He found Silca System grates, recycled polymer made in the United States, screwed them to the frame he already had, and turned the deck into stone. Visitors assumed the wood was gone.
That is the cycle you are selling against. Boards take sun on top and trap water on the joists. The wood never really dries. The owner restains, or they call a deck company instead of you.
A raised interlock patio fails the other way. You excavate, haul aggregate, stack a wall, and compact the middle without shoving the walls. Fresh fill has not settled. Roots, water lines, and a septic bed are in the way, and access may be a person-gate. A frame on footings below frost, or on a ledger, does not ask that soil to hold the patio. You still design the frame. A gravel box is not the only way to get stone up to a door.
Three Subfloors, Not One Upgrade
SilcaGrate, TileDeck, and Paverdeck are three ways to carry pavers, brick, porcelain, or flagstone. Borger was plain that none of them wins every job. Match the frame that is already there, the tools your crew will actually use, and what the owner is afraid of.
The skirt is shared. A few feet up, frame a wall, skin it with half-inch cement board, and veneer, parge, or clad it in wood or composite. You can leave it open and plant in front. Decide before the cap. Overhang and any drip edge follow that wall. Rail posts still need blocking underneath.
Then adhere the cap, dry-lay the field, and sweep polymeric sand if the joint wants sand. There is no driveway-style compactor pass, which is why a cladding thickness is allowed. He named a Techo-Bloc Blu 45 mm and a 50 mm Permacon as examples. Confirm the current unit before you order. He would rather you sell the thinner paver: lighter, faster to cut, cheaper. Match an 80 mm driveway paver, including the older Techo-Bloc Olympia he cited, only after the frame is designed for it.
SilcaGrate on wood joists
SilcaGrate is the retrofit, and the one to learn if your crew already frames lumber. In the episode each grate is 16 by 18 inches, two square feet, screwed down with a standard 3 to 3 1/2 inch coated deck screw. The pattern is a honeycomb. Only a thin rib of polymer sits on the joist, so the wood can dry after rain and after the swing from winter humidity to summer. That drying is his answer to rot, not a coating.
He offered his own deck as a check, and it should stay an anecdote. At the interview the grates had been down about 10 years on wood about 14 years old. He looks under it when he pumps the septic and said he was not seeing rot. Joist-guard tape is an accessory for owners who want extra cover. It is not the system. The grate is open, so geotextile goes down before bedding or polymeric sand. The fabric holds sand. It does not stiffen the deck.
When it fits. Sound joists, or a new wood frame you will engineer. Tight access, a tree you will not trench, a septic bed, a water line, or a porch on fill that will move for a year. He described a Montreal porch on fresh backfill: other contractors told the street to wait, and a SilcaGrate build on screw piles and a ledger took the work. That only holds if you are not bearing on the fill. It is not permission to skip footings.
Warranty he stated. Twenty years residential on the grates, ten years commercial. He said they are U.S.-made and had been tested to California code, which he called one of the stricter codes around. Read the current warranty. Workmanship is still yours.
What you still design. Stone thickness drives the joists. He pointed to load tables on stonedeck.ca, including retrofit notes, broken out by region. If you cannot read them, bring an engineer before you tell anyone the old frame is fine. Flagstone plus a sand bed is heavier than a 45 mm paver. Count the sand.
Paverdeck as a galvanized kit
Paverdeck joined the line when the Canadian dollar made the imported grate harder to price. The maker he named is Evolution Decks in Sault Ste. Marie, Ontario. It is a galvanized steel frame and subfloor that ships as a kit: starters, field panels, end panels, fascia, and self-tapping galvanized screws, usually on one pallet. You are not buying joists. You are assembling a steel deck, then cladding it.
Before the kit is cut he wants three answers: attached or freestanding, stone thickness, and the postal code so snow load can set the footings. His Ottawa 10 by 10, attached to the house, was one beam and two footings, screw piles or concrete. The house end was an iron lintel about 4 by 4 by 1 1/4 inches on the foundation. The outer beam sits on the piles.
Cut it with a 4-inch grinder or a quick-cut saw and an abrasive or diamond blade meant for steel. A wood blade is the wrong tool. Some crews like buying galvanized brackets for odd corners. Others would rather rip wood. Believe the crew you have.
When it fits. A new deck, including a second story, a ramp, or a wide stair, when you want frame and subfloor from one supplier. A winter build, because a screw pile can go through frost when you cannot excavate. An owner who wants steel and the longer warranty more than they want the old joists.
Job stories, not a labor rate. On a 12 by 12, two people and a pile crew had the steel standing by late morning, with cap and skirt as a two- or three-day target. On a northern Quebec deck about 4 feet high, 20 by 40, with a ramp and wide stairs, piles went in Friday, a four-person crew plus a trainer had the steel up by Tuesday noon, and the stone (Permacon grid veneer, Techo-Bloc Blu 45 on top) was done by Friday lunch. He said later winters brought no heave and no callback. Your first one will be slower. Nobody placed gravel.
Weight and warranty, from the episode. He put Paverdeck at about 9 pounds per square foot, a 45 mm paver around 17 to 19, and a 60 mm paver closer to 30. An 80 mm unit can go on if the spans, beams, and footings are designed for it. The panel does not get a free pass because it feels stout. He stated a 30-year warranty on the Paverdeck structure, and he described sacrificial anodes you can add and replace if you want another layer on the steel. He also said the engineering package, including UL and CSA paperwork, is on the product page. That sheet belongs in the permit set. The podcast does not.
Ask the pile company to warrant the piles and to issue a report from the dead load. That stamp is theirs, not yours.
TileDeck on the joists you keep
TileDeck is the steel subfloor without the steel frame. Evolution Decks released it so an existing wood deck could take stone without a full demolition. Paverdeck does not do that unless the frame comes out. SilcaGrate does. TileDeck is the galvanized version of the same idea.
Each panel, as he described it, is 6 inches by 48 inches, two square feet. A 10 by 10 is 100 square feet and 50 panels. Panels run perpendicular to the joists. The screws sold with the panel are self-tapping stainless, so the galvanizing does not react with the treatment in the lumber. You can supply your own screws if they match: stainless, self-drilling, and the length he specifies. A bucket of ordinary deck screws is how that connection starts to corrode where you cannot see it.
The surface matches the other two. Geotextile if you are holding sand. Glue the cap. Dry-lay the field. Sweep the joints. On a new deck you can frame in wood and use TileDeck only as the floor. He stated a 20-year warranty and said the panels carry the load when the wood under them is right. The wood is still your design. Heavy stone may mean sistering joists or adding a beam. He sent people to the TileDeck page for that check.
Porcelain with open joints is its own conversation. A 20 mm paver on spacers, with no sand, can show the silver panel through a gap he put at about 1/8 inch or 3/16 inch. Set two tiles in the sun with the owner before you commit. If they hate the glint, a cheap geotextile is only a mask. It is not structural. Do not buy subfloor fabric for that, and do not skip the look.
Caps, Uneven Stone, and the Heavy Stuff
Owners pick a field paver, then a thicker cap. On SilcaGrate he sisters lumber inside the joists, cuts the grates to sit between them, and drops the field. His example was a 75 mm cap against a 45 mm field, about an inch and a half of grate height. The sketch is on the Silca page. Do it before the cap is glued.
A few millimetres of paver variation is different. Sweep polymeric sand, lay plywood, and run the smallest compactor on a light vibration so sand fills the joints. That is not a base-compaction spec. Flagstone gets doubled geotextile, washed concrete sand struck with a half-inch notched trowel, and a polymeric made for wide joints. Weigh stone and sand before you lock the layout.
Tubs, ovens, kitchens, fireplaces, and planters came up in both episodes. He said he had not seen a residential feature these systems could not be designed to carry, including a 12-person tub on a second-story Paverdeck. That is a design claim, not a published load. A one-beam 10 by 10 is not the kit that carried a fireplace and an oven. Those jobs added beams. Price the heavy object before the countertop.
Under the deck, gas, power, and plumbing stay reachable without a trench. A tub can drop into the frame with stone tight to the shell. The same idea covers a semi-inground pool edge. Dry storage means a water barrier instead of geotextile. One layer cannot be both the sand tray and the lid of a storage bay.
Where These Jobs Fail After You Leave
Rot you inherited. Soft joists at the old board line get replaced. A honeycomb will not dry lumber that is already gone.
Sand in the yard. An open grate without geotextile dumps polymeric into the garden. For sand on SilcaGrate or Paverdeck he wants a heavy commercial sheet. He named a 7-ounce fabric, EX-160, because it does not creep. Light fabric is only the TileDeck color mask.
The wrong paver, blade, or screw. A 45 mm cladding unit is allowed here because you do not compact it. That same unit does not go on a granular driveway base. Paverdeck needs a metal blade. TileDeck needs stainless self-tappers.
A fear, or a footing, you hand-wave. One owner refused steel over lightning. Another refused polymer because they thought a fire would melt it. Offer the other system. If the permit asks about fire or bonding, use the product sheet. And a frame only stays put when piles or piers are below frost, or the ledger is on the house. A pile that never hit torque, or a beam on a patio stone, still moves. “It will not move” is a sales line, not a report you did not order.
How to Quote It
Stone is the large line, not the grate. His 2020 illustration was roughly $5 a square foot in stone against about $10 in porcelain. Price the unit in front of you.
Structure numbers from that same conversation, not a rate you should still use:
- SilcaGrate at $7.50 a square foot, plus pressure-treated framing he put around $3 to $5.
- TileDeck at the same $7.50, plus stainless screws. The money can look like a SilcaGrate screw package. The metal spec cannot.
- Paverdeck around $10 to $15 a square foot for beams, panels, and screws. A basic attached 10 by 10 with one beam was under $11. The richest layout he cited, an Oakville deck with a fireplace and a pizza oven, was still under $15 because of extra beams.
A wood frame plus SilcaGrate can land next to a Paverdeck kit. Choose on comfort, warranty, and whether the old joists stay. Steel is not an automatic upsell.
Labor is the comparison that matters. A raised patio is excavation, gravel, wall, compaction, and often a fence coming down. He talked about carrying pieces through about a 36-inch gate, with a walk-behind pile machine that fits the same opening. A frame you stand and then clad is not a wall you compact all week. Do not blend the two scopes and average the hours.
Use a current distributor price, a footing count from snow load and stone weight, and a lumber takeoff if the frame is wood. The product warranty in the proposal is the manufacturer’s. Workmanship is yours. He said that as of the interview the line had been out almost 10 years in eight provinces with no claims back to him. That was 2020. It does not cap a repair if the joists were light.
Permits, guards, and snow load are local. He skipped them on purpose. A second-story tub is a permit item before it is a pallet. Ask for surface, height, attached or freestanding, what is already framed, and what heavy object lands on it, then name the system. A bare “stone deck” line gets compared to a wood deck that carries none of that weight.
Pedestals are a different product in the same catalog, for roofs and overlays. Leave them out unless the job is a roof.
How to Start This Week
- Walk one tired wood deck. Note joist size, spacing, height, and whether the lumber under the boards is still sound.
- Choose the system before you price stone. Sound joists point to SilcaGrate or TileDeck. A frame you do not trust points to Paverdeck or new lumber.
- If they want a 60 mm or 80 mm driveway paver, say a cladding thickness is the intended surface. Price the heavy unit only after the spans are checked.
- Pull the current load table or kit sheet for your snow load. If you cannot read it on an existing deck, book an engineer before the proposal.
- Price geotextile alone. Heavy fabric under sand on SilcaGrate or Paverdeck. A cheap mask only if porcelain on TileDeck flashes metal.
- Price screw piles against concrete footings, and ask the pile company for a report based on the dead load.
- Put gas, power, storage, and any tub or oven in the scope, including extra beams or a water barrier.
- Use today’s distributor price. Every dollar in this article is from 2020.
- Name the product, the warranty you can document, and what you warrant in the frame and the set of the stone.
The full conversations are SilcaGrate with Stone Deck Innovations and Paverdeck and TileDeck with Stone Deck Innovations.

